Alaska E-Line

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
Back to Portal

E-Line Safety Audit

Cable, drum, wellhead and crew checks before an electric line job

Job
Cable and drum
Cable armor is intact, with no birdcages, flat spots or broken outer wires
Photo
Drum brake holds the line and the level wind tracks
Photo
Depth and tension displays agree with a known mark on the cable
Photo
Collector and the unit ground are connected and not damaged
Photo
Wellhead and pressure
Well pressure and the fluid in the well are known before the head is opened
Photo
Grease head, packoff and lubricator are rated above the expected pressure
Photo
The valve sequence for opening and closing the well is written on the job plan
Photo
A drip pan or liner is under the head and the hose connections
Photo
Crew and plan
The crew is wearing the PPE named for pressure, cable and the site
Photo
The drum, sheave and line of fire are marked and kept clear
Photo
The JSA names the electric line hazards for this run, not a generic list
Photo
A new hand is paired with a person who has run this service before
Photo
Everyone can point to the muster point and the site alarms
Photo
Notes

AnthroSafe™ Field Driven Safety © 2026 SLP Alaska, LLC